You can uplift multiple continuous schedules at the same time, by a percentage, by an amount, or to a fixed value. Each uplift takes effect on the Start Date you choose, so you can schedule it as far ahead as you need.
šNote: Bulk uplifts apply to continuous schedules only.
ā ļøImportant: Only one uplift can be in effect on a schedule at a time. If you set a new uplift on a schedule that already has one scheduled, the new uplift replaces the previous one until the previous uplift takes effect.
Download the file
Use the filters to choose the schedules you want to uplift, then download an Excel file of the matching recurring payments.
Click [Bulk update menu option].
Select the Fund. You can choose Weekly, Monthly, or both.
Enter the Start Date. This is the date the uplift takes effect from.
Select the Type, which can be:
Uplift in Percentage: Raises the current amount by a percentage.
Amount: Raises the current amount by the amount you enter.
Fixed Amount: Changes the current amount to the amount you enter.
Enter the value in the Amount box. If you selected Uplift in Percentage, enter the percentage in the Amount (%) box instead.
Optional: Enter a Reference, Address, or Postcode to narrow the records selected for uplift.
Click [Download button] to download the Excel file.
For example, if the current amount is £10.00:
Select Uplift in Percentage and enter 2 in the Amount (%) box. This raises the current amount by 2% to £10.20.
Select Amount and enter £20.00 in the Amount box. This raises the current amount by £20.00 to £30.00.
Select Fixed Amount and enter £20.00 in the Amount box. This changes the new amount to £20.00.
Schedules without a file
Use this option to process the changes straight away. The changes are stored in the system, so you don't need to import the file.
If you're happy with the new amounts, click I confirm I have reviewed the file.
Click Bulk Update.
Schedules with a file
Use this option if you have amended the downloaded file. Importing the file lets you set up a scheduled job to process the changes.
Import the amended spreadsheet using the standard import S0800, which is set up to import the data into the correct table.
Once imported, go to Job Maintenance, then add a task to an existing job or a new job.
Save the task, then click Run Now from the listing page to start the process.
Audit trail
Every bulk uplift is recorded in an audit table, so you can see what changed and who made the change.
The audit shows which schedules were uplifted, when, the original and new amounts, and who made the uplift.
To view this information, set up a custom report using the Report Source Code 00034 ā Bulk Uplift Holding Audit.
